Triple

T16065413
Position Surface form Disambiguated ID Type / Status
Subject Wivenhoe Dam E389718 entity
Predicate hydroelectricPlantCapacity P29533 FINISHED
Object 500 MW LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 500 MW | Statement: [Wivenhoe Dam, hydroelectricPlantCapacity, 500 MW]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hydroelectricPlantCapacity
Context triple: [Wivenhoe Dam, hydroelectricPlantCapacity, 500 MW]
  • A. hydroelectricStationCapacity chosen
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • B. rankAmongWorldHydroelectricPlantsByCapacity
    Indicates the position of a hydroelectric plant in a global ranking ordered by its electricity generation capacity.
  • C. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • D. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • E. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86daf32ec8190a8c0466c8f49c3c0 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e1858a00888190b8505071575dc56f completed April 17, 2026, 12:57 a.m.
PD Predicate disambiguation batch_69e18272f2288190a17d45fb01cc2b07 completed April 17, 2026, 12:44 a.m.
Created at: April 10, 2026, 4:57 a.m.