Triple
T16065413
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wivenhoe Dam |
E389718
|
entity |
| Predicate | hydroelectricPlantCapacity |
P29533
|
FINISHED |
| Object | 500 MW |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 500 MW | Statement: [Wivenhoe Dam, hydroelectricPlantCapacity, 500 MW]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hydroelectricPlantCapacity Context triple: [Wivenhoe Dam, hydroelectricPlantCapacity, 500 MW]
-
A.
hydroelectricStationCapacity
chosen
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
-
B.
rankAmongWorldHydroelectricPlantsByCapacity
Indicates the position of a hydroelectric plant in a global ranking ordered by its electricity generation capacity.
-
C.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
D.
grossElectricalCapacity_MWe
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
-
E.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86daf32ec8190a8c0466c8f49c3c0 |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e1858a00888190b8505071575dc56f |
completed | April 17, 2026, 12:57 a.m. |
| PD | Predicate disambiguation | batch_69e18272f2288190a17d45fb01cc2b07 |
completed | April 17, 2026, 12:44 a.m. |
Created at: April 10, 2026, 4:57 a.m.