Triple

T1597028
Position Surface form Disambiguated ID Type / Status
Subject Great Stone Dam E34306 entity
Predicate instanceOf P0 FINISHED
Object granite dam C4159 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: granite dam
Context triple: [Great Stone Dam, instanceOf, granite dam]
  • A. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • B. arch-gravity dam
    An arch-gravity dam is a concrete dam that combines the curved, arch action of an arch dam with the mass and weight-based stability of a gravity dam to resist water pressure.
  • C. concrete gravity dam
    A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
  • D. masonry gravity dam chosen
    A masonry gravity dam is a massive structure built from stone or brick masonry whose own weight resists the horizontal pressure of the water it retains.
  • E. granite monolith
    A granite monolith is a massive, singular block of hard, coarse-grained igneous rock, often standing prominently as a natural or sculpted geological feature.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885fdcb9c819081ce6f0b8cd477dd completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:27 p.m.