Triple

T15965848
Position Surface form Disambiguated ID Type / Status
Subject NS Washington District E387188 entity
Predicate instanceOf P0 FINISHED
Object Norfolk Southern Railway line C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Norfolk Southern Railway line
Context triple: [NS Washington District, instanceOf, Norfolk Southern Railway line]
  • A. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • B. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • C. Amtrak Thruway Motorcoach route
    An Amtrak Thruway Motorcoach route is a scheduled bus service that connects passengers to and from Amtrak train stations, extending rail network coverage to areas not directly served by trains.
  • D. rail route
    A rail route is a defined path or corridor along which trains operate between specified locations, following a scheduled sequence of stops and track segments.
  • E. freight railroad network
    A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da94ccc819083d187f5dc6a123e completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:54 a.m.