Triple

T15953613
Position Surface form Disambiguated ID Type / Status
Subject Nextel Communications E386876 entity
Predicate brandPhaseOut P39194 FINISHED
Object 2013 in the United States LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2013 in the United States | Statement: [Nextel Communications, brandPhaseOut, 2013 in the United States]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: brandPhaseOut
Context triple: [Nextel Communications, brandPhaseOut, 2013 in the United States]
  • A. discontinuationAnnouncedBy
    Indicates that an entity’s discontinuation (e.g., of a product, service, or activity) has been formally announced by a specific agent or organization.
  • B. brandDiscontinuedAfter
    Indicates that a brand ceased to exist or operate after a specified time or event.
  • C. brandOwnerUntil
    Indicates that an entity is the owner of a brand up to, but not after, a specified point in time.
  • D. developmentPhaseAtCancellation
    Indicates the specific stage of development a project or product had reached at the time it was cancelled.
  • E. phasesOut chosen
    Indicates the process by which one entity or condition is gradually discontinued or removed in favor of another over time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da882448190a82ea962fe343b79 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e17d4d08f481909f38b75e3f42d9ab completed April 17, 2026, 12:22 a.m.
PD Predicate disambiguation batch_69e142d37cd88190ab50760f1783e20c completed April 16, 2026, 8:13 p.m.
Created at: April 10, 2026, 4:53 a.m.