Triple

T15928290
Position Surface form Disambiguated ID Type / Status
Subject DLR Columbus Control Center E386259 entity
Predicate instanceOf P0 FINISHED
Object spaceflight operations facility C34654 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spaceflight operations facility
Context triple: [DLR Columbus Control Center, instanceOf, spaceflight operations facility]
  • A. space operations center chosen
    A space operations center is a specialized facility that monitors, controls, and coordinates spacecraft, satellites, and related space missions in real time.
  • B. space launch facility
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • C. spaceflight center
    A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
  • D. spaceport facility
    A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
  • E. spaceport facility component
    A spaceport facility component is an individual physical or functional element—such as launch pads, control centers, fueling systems, or passenger terminals—that collectively enables the operation, support, and management of spaceflight activities at a spaceport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da750008190987eb26be3f6c118 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:52 a.m.