Triple
T15919821
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Electric Reliability Organization |
E386062
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electricity reliability regulator |
C36674
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electricity reliability regulator Context triple: [Electric Reliability Organization, instanceOf, electricity reliability regulator]
-
A.
regional transmission organization
A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
-
B.
electricity industry association
An electricity industry association is an organized group that represents and advocates for the collective interests of companies and stakeholders involved in the generation, transmission, distribution, and sale of electric power.
-
C.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
D.
wholesale electricity market operator
A wholesale electricity market operator is an entity that administers and coordinates the buying and selling of electricity in bulk, ensuring efficient market functioning, system reliability, and fair access for generators and large consumers.
-
E.
energy supplier
An energy supplier is an entity that procures, manages, and delivers electricity and/or gas to consumers, handling contracts, billing, and customer service while interfacing with energy producers and grid operators.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da686e4819097cbf3b1fc2d881d |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:52 a.m.