Triple
T1590447
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cisco Nexus switches |
E34166
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | data center switch |
C2108
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: data center switch Context triple: [Cisco Nexus switches, instanceOf, data center switch]
-
A.
network operations facility
A network operations facility is a centralized, secure environment where personnel and systems monitor, manage, and maintain an organization’s communication networks and related infrastructure to ensure reliable, efficient, and secure operations.
-
B.
network connector
A network connector is a component that establishes, maintains, and manages communication links between devices or systems within a network.
-
C.
networking hardware vendor
A networking hardware vendor is a company that designs, manufactures, and sells physical devices such as routers, switches, and firewalls that enable and manage data communication across computer networks.
-
D.
networking hardware company
A networking hardware company designs, manufactures, and sells physical devices and infrastructure that enable data communication and connectivity across computer networks.
-
E.
internet infrastructure component
chosen
An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885fceb2c8190b47e0f7c0aefbff0 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:27 p.m.