Triple
T15891539
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Freeway 5 |
E385335
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road infrastructure in Taiwan |
C2978
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road infrastructure in Taiwan Context triple: [National Freeway 5, instanceOf, road infrastructure in Taiwan]
-
A.
road infrastructure
chosen
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
B.
bridge in Taiwan
A bridge in Taiwan is a structural construction that spans physical obstacles such as rivers, valleys, or roads within Taiwan’s territory to provide transportation routes for vehicles, pedestrians, or railways.
-
C.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
D.
road network
A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
-
E.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da5b800819083a31be937d738b0 |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:51 a.m.