Triple
T1588243
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brasília |
E34115
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | modernist city |
C8996
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: modernist city Context triple: [Brasília, instanceOf, modernist city]
-
A.
modernist urban design proposal
A modernist urban design proposal is a conceptual plan for a city or district that emphasizes functional zoning, clean geometric forms, and the integration of architecture, infrastructure, and open space to achieve efficiency, order, and a forward-looking aesthetic.
-
B.
modernist architectural work
A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
-
C.
modernist architecture movement
The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
-
D.
modernist architecture work
A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
-
E.
modernist furniture
Modernist furniture is a style of furnishings characterized by clean lines, functional forms, minimal ornamentation, and the use of modern materials like steel, glass, and molded plywood to emphasize simplicity and practicality.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885fceb2c8190b47e0f7c0aefbff0 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:27 p.m.