Triple

T15850933
Position Surface form Disambiguated ID Type / Status
Subject Los Angeles Plumbing Code E384335 entity
Predicate instanceOf P0 FINISHED
Object plumbing code C21996 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: plumbing code
Context triple: [Los Angeles Plumbing Code, instanceOf, plumbing code]
  • A. pressure piping code
    A pressure piping code is a set of engineering standards and regulations that govern the design, fabrication, inspection, testing, and operation of piping systems that contain fluids under pressure to ensure safety and reliability.
  • B. piping standard
    A piping standard is a formal specification that defines the materials, dimensions, design, fabrication, testing, and installation requirements for piping systems to ensure safety, compatibility, and performance.
  • C. pressure equipment code
    A pressure equipment code is a formal set of engineering standards and regulatory requirements that govern the design, fabrication, inspection, testing, and safe operation of pressure-containing equipment such as boilers, pressure vessels, and piping systems.
  • D. building code chosen
    A building code is a set of regulations and standards that govern the design, construction, alteration, and maintenance of structures to ensure safety, health, accessibility, and energy efficiency.
  • E. sewer utility
    A sewer utility is an organization or system responsible for collecting, transporting, treating, and safely disposing of wastewater and sewage from homes, businesses, and industries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da422088190aac39e32e6c68429 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:50 a.m.