Triple

T15825335
Position Surface form Disambiguated ID Type / Status
Subject Stord Municipality E383725 entity
Predicate hasTransportInfrastructure P2560 FINISHED
Object Stord Bridge E1136107 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Stord Bridge | Statement: [Stord Municipality, hasTransportInfrastructure, Stord Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Stord Bridge
Context triple: [Stord Municipality, hasTransportInfrastructure, Stord Bridge]
  • A. Stord Bridge chosen
    Stord Bridge is a major suspension bridge in western Norway that connects the island of Stord to the mainland as part of an important regional transport route.
  • B. Sotra Bridge
    Sotra Bridge is a major suspension bridge in western Norway that links the island of Sotra to the mainland near Bergen.
  • C. Nordhordland Bridge
    The Nordhordland Bridge is a major road bridge in western Norway that carries traffic across the Salhusfjorden to connect the city of Bergen with surrounding areas.
  • D. Storseisundet Bridge
    Storseisundet Bridge is a dramatic, curved cantilever bridge in Norway that forms part of the scenic Atlantic Ocean Road, known for its striking architecture and exposure to rough coastal weather.
  • E. Mjøsund Bridge
    Mjøsund Bridge is a cantilever road bridge in Troms og Finnmark county, Norway, that connects the island of Andørja to the mainland across the Mjøsundet strait.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da34c888190976e06c4019d415a completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e11e602e5481908baa71c3d9b2008f completed April 16, 2026, 5:37 p.m.
NED1 Entity disambiguation (via context triple) batch_69ffb03ac77081908f2b169d7d26b318 completed May 9, 2026, 10:07 p.m.
Created at: April 10, 2026, 4:49 a.m.