Triple

T15810719
Position Surface form Disambiguated ID Type / Status
Subject Terminal B (George Bush Intercontinental Airport) E383343 entity
Predicate isPartOf P10 FINISHED
Object passenger terminal complex of George Bush Intercontinental Airport
The passenger terminal complex of George Bush Intercontinental Airport is the integrated set of airport terminals and related facilities that handle check-in, security, boarding, and passenger services for one of Houston’s major international air gateways.
E79178 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: passenger terminal complex of George Bush Intercontinental Airport | Statement: [Terminal B (George Bush Intercontinental Airport), isPartOf, passenger terminal complex of George Bush Intercontinental Airport]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: passenger terminal complex of George Bush Intercontinental Airport
Context triple: [Terminal B (George Bush Intercontinental Airport), isPartOf, passenger terminal complex of George Bush Intercontinental Airport]
  • A. George Bush Intercontinental Airport
    George Bush Intercontinental Airport is a major international airport serving the Houston, Texas area and one of the primary hubs for United Airlines.
  • B. Terminal 2 complex
    Terminal 2 complex is a major multi-terminal passenger facility at Paris Charles de Gaulle Airport that groups several interconnected sub-terminals and services.
  • C. Terminal 2 complex
    Terminal 2 complex is the main passenger terminal area at Budapest Ferenc Liszt International Airport, handling the majority of the airport’s commercial flights and services.
  • D. Austin-Bergstrom International Airport
    Austin-Bergstrom International Airport is the primary commercial airport serving the Austin, Texas metropolitan area, offering domestic and limited international flights.
  • E. NAIA Terminal 3
    NAIA Terminal 3 is a major passenger terminal of Ninoy Aquino International Airport in Manila, Philippines, serving both domestic and international flights with modern facilities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: passenger terminal complex of George Bush Intercontinental Airport
Triple: [Terminal B (George Bush Intercontinental Airport), isPartOf, passenger terminal complex of George Bush Intercontinental Airport]
Generated description
The passenger terminal complex of George Bush Intercontinental Airport is the integrated set of airport terminals and related facilities that handle check-in, security, boarding, and passenger services for one of Houston’s major international air gateways.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: passenger terminal complex of George Bush Intercontinental Airport
Target entity description: The passenger terminal complex of George Bush Intercontinental Airport is the integrated set of airport terminals and related facilities that handle check-in, security, boarding, and passenger services for one of Houston’s major international air gateways.
  • A. George Bush Intercontinental Airport chosen
    George Bush Intercontinental Airport is a major international airport serving the Houston, Texas area and one of the primary hubs for United Airlines.
  • B. Terminal 2 complex
    Terminal 2 complex is a major multi-terminal passenger facility at Paris Charles de Gaulle Airport that groups several interconnected sub-terminals and services.
  • C. Terminal 2 complex
    Terminal 2 complex is the main passenger terminal area at Budapest Ferenc Liszt International Airport, handling the majority of the airport’s commercial flights and services.
  • D. Austin-Bergstrom International Airport
    Austin-Bergstrom International Airport is the primary commercial airport serving the Austin, Texas metropolitan area, offering domestic and limited international flights.
  • E. NAIA Terminal 3
    NAIA Terminal 3 is a major passenger terminal of Ninoy Aquino International Airport in Manila, Philippines, serving both domestic and international flights with modern facilities.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da2858c819090cc8481e7207b6e completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e0b52aae14819091de08630e7e1d1a completed April 16, 2026, 10:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff999210148190baa6dcb19be3a1d3 completed May 9, 2026, 8:31 p.m.
NEDg Description generation batch_69ff9aa845348190907116612d2c87cd completed May 9, 2026, 8:35 p.m.
NED2 Entity disambiguation (via description) batch_69ff9b8833b88190967db29027b5f987 completed May 9, 2026, 8:39 p.m.
Created at: April 10, 2026, 4:49 a.m.