Triple

T1579898
Position Surface form Disambiguated ID Type / Status
Subject Francis Egerton, 3rd Duke of Bridgewater E33737 entity
Predicate instanceOf P0 FINISHED
Object canal builder C8973 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: canal builder
Context triple: [Francis Egerton, 3rd Duke of Bridgewater, instanceOf, canal builder]
  • A. canal
    A canal is a man-made waterway constructed to facilitate transportation, irrigation, drainage, or water management between different locations.
  • B. canal lock
    A canal lock is a gated chamber in a waterway that raises or lowers boats between stretches of water at different levels by controlling the water height within the enclosure.
  • C. canal wharf
    A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
  • D. bodybuilder
    A bodybuilder is an individual who systematically trains with resistance exercises and follows specialized nutrition to develop highly muscular, well-defined, and aesthetically proportioned physique.
  • E. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885f27a4c8190a4622252cdf54c00 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:27 p.m.