Triple

T1579618
Position Surface form Disambiguated ID Type / Status
Subject Leeds and Liverpool Canal E33731 entity
Predicate instanceOf P0 FINISHED
Object industrial canal C3383 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: industrial canal
Context triple: [Leeds and Liverpool Canal, instanceOf, industrial canal]
  • A. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • B. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • C. drainage channel
    A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
  • D. canal chosen
    A canal is a man-made waterway constructed to facilitate transportation, irrigation, drainage, or water management between different locations.
  • E. canal wharf
    A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885f27a4c8190a4622252cdf54c00 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:27 p.m.