Triple

T15767148
Position Surface form Disambiguated ID Type / Status
Subject Nigeria LNG plant at Bonny Island E382250 entity
Predicate statusOfTrain7 P120252 FINISHED
Object under construction LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: under construction | Statement: [Nigeria LNG plant at Bonny Island, statusOfTrain7, under construction]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: statusOfTrain7
Context triple: [Nigeria LNG plant at Bonny Island, statusOfTrain7, under construction]
  • A. followingTrainStatus
    Indicates that one entity is tracking or monitoring the current operational status or progress of a train.
  • B. railStatus
    Indicates the current operational condition or state of a rail-related entity (such as a track, line, or service) within the system.
  • C. railLineStatusAfterward
    Indicates the condition or operational status of a rail line after a specified event or time period has occurred.
  • D. trainsOn
    Indicates that one entity receives training, instruction, or practice using or based on another entity (such as a resource, dataset, tool, or subject).
  • E. hasNextTrainIndicators
    Indicates that there are one or more indicators providing information about the next train in a sequence or schedule.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da09a10819082fe9797b23e4664 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e051951bac8190a7d45f3612c6de72 completed April 16, 2026, 3:03 a.m.
PD Predicate disambiguation batch_69e00531e7ac8190a4190cce4f7fab4c completed April 15, 2026, 9:37 p.m.
PDg Predicate description generation batch_69e03cc871d0819085c0fc54de7984ff completed April 16, 2026, 1:35 a.m.
Created at: April 10, 2026, 4:47 a.m.