Triple
T1568813
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Westchester |
E33492
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | enclosed shopping mall |
C1998
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: enclosed shopping mall Context triple: [The Westchester, instanceOf, enclosed shopping mall]
-
A.
shopping mall
chosen
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
B.
shopping centre
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
C.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
-
D.
shopping street
A shopping street is a public thoroughfare lined with a variety of retail stores, services, and eateries designed for pedestrian access and commercial activity.
-
E.
department store
A department store is a large retail establishment that offers a wide variety of goods, such as clothing, home furnishings, cosmetics, and appliances, organized into specialized departments under one roof.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885f11b048190935025a035302715 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:27 p.m.