Triple
T15657813
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lake Allatoona |
E376489
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Allatoona Dam |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Allatoona Dam | Statement: [Lake Allatoona, hasDam, Allatoona Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Allatoona Dam Context triple: [Lake Allatoona, hasDam, Allatoona Dam]
-
A.
Allatoona Dam
chosen
Allatoona Dam is a large U.S. Army Corps of Engineers hydroelectric and flood-control dam in northwestern Georgia that creates Lake Allatoona.
-
B.
Loveland Dam
Loveland Dam is a concrete arch-gravity dam in San Diego County, California, primarily used for water storage and flood control.
-
C.
Granger Dam
Granger Dam is a flood-control and water-management structure located on the San Gabriel River in Southern California.
-
D.
Goodwin Dam
Goodwin Dam is a concrete gravity diversion dam on California’s Stanislaus River that helps regulate river flow and supplies irrigation water to surrounding agricultural areas.
-
E.
Nine Mile Dam
Nine Mile Dam is a historic hydroelectric dam on Washington State’s Spokane River that has supplied power to the Spokane region since the early 20th century.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd1564c8190991adda63bfab4b0 |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e04ef3cb8c8190a10815b675b341c1 |
completed | April 16, 2026, 2:52 a.m. |
Created at: April 10, 2026, 4:15 a.m.