Triple

T15645461
Position Surface form Disambiguated ID Type / Status
Subject Zhonghe–Xinlu line E376165 entity
Predicate instanceOf P0 FINISHED
Object Taipei Metro line C641 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Taipei Metro line
Context triple: [Zhonghe–Xinlu line, instanceOf, Taipei Metro line]
  • A. Kaohsiung MRT station
    A Kaohsiung MRT station is a designated public transit facility within the Kaohsiung Mass Rapid Transit system where passengers access, board, transfer between, and alight from metro trains and related services.
  • B. subway line chosen
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • C. Taiwan Railways Administration station
    A Taiwan Railways Administration station is a designated railway facility in Taiwan where TRA trains stop to allow passengers and freight to board, alight, or be transferred, and which provides related operational and customer services.
  • D. BTS Skytrain facility
    A BTS Skytrain facility is an infrastructure element that supports the operation, maintenance, and management of Bangkok’s elevated rapid transit system, including stations, depots, control centers, and related service areas.
  • E. Shanghai Metro station
    A Shanghai Metro station is a designated public transit facility within the Shanghai Metro network where passengers access, board, transfer between, and alight from metro trains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd1564c8190991adda63bfab4b0 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:15 a.m.