Triple

T15616192
Position Surface form Disambiguated ID Type / Status
Subject LisaList E375417 entity
Predicate instanceOf P0 FINISHED
Object list management utility C36415 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: list management utility
Context triple: [LisaList, instanceOf, list management utility]
  • A. package management system
    A package management system is a tool that automates the processes of finding, installing, upgrading, configuring, and removing software packages and their dependencies in a consistent and reliable way.
  • B. curated list
    A curated list is a thoughtfully selected and organized collection of items chosen according to specific criteria to highlight quality, relevance, or thematic coherence.
  • C. site management tool
    A site management tool is a software application that centralizes and streamlines the planning, monitoring, and control of all activities, resources, and configurations associated with operating and maintaining a website or physical site.
  • D. Lisa application
    The Lisa application is a software program designed to run on the Lisa operating environment, providing users with specific productivity or utility functions through a graphical user interface.
  • E. social organizer
    A social organizer is a person or system that plans, coordinates, and manages events or activities to facilitate interaction, engagement, and connection among individuals or groups.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccf2794819096cda4cbcb02d478 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:13 a.m.