Triple

T15614229
Position Surface form Disambiguated ID Type / Status
Subject BSU-49/B air-inflatable retarder E375371 entity
Predicate instanceOf P0 FINISHED
Object high-drag bomb tail kit C22926 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-drag bomb tail kit
Context triple: [BSU-49/B air-inflatable retarder, instanceOf, high-drag bomb tail kit]
  • A. bomber wing
    A bomber wing is a large military aviation unit composed of multiple bomber squadrons, support elements, and command staff organized to plan, coordinate, and execute bombing operations.
  • B. aviation component chosen
    An aviation component is an individual part or subsystem designed, manufactured, and certified to perform a specific function within an aircraft or related aerospace system.
  • C. twin-boom aircraft
    A twin-boom aircraft is an airplane whose tail assembly is supported by two longitudinal structures (booms) extending rearward from the wings or fuselage, typically joined at the tail by a horizontal stabilizer.
  • D. aerial bomb
    An aerial bomb is an explosive weapon designed to be dropped from aircraft to detonate on or near a target, causing destructive blast, fragmentation, or specialized effects.
  • E. afterburning turbofan engine
    An afterburning turbofan engine is a type of jet engine that combines a turbofan’s efficient core and bypass airflow with an additional combustion stage in the exhaust (afterburner) to provide short-term, significantly increased thrust, typically for military aircraft.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccf2794819096cda4cbcb02d478 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:13 a.m.