Triple
T15614228
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BSU-49/B air-inflatable retarder |
E375371
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | air-inflatable retarder |
C33355
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: air-inflatable retarder Context triple: [BSU-49/B air-inflatable retarder, instanceOf, air-inflatable retarder]
-
A.
non-steerable parachute
A non-steerable parachute is a canopy-based descent system that passively slows and stabilizes a falling object or person without providing directional control or maneuverability.
-
B.
air-cushion vehicle
An air-cushion vehicle is a craft that travels over land or water supported by a cushion of air formed by downward-directed fans and contained by flexible skirts.
-
C.
static-line parachute system
chosen
A static-line parachute system is a deployment method in which a parachute is automatically opened by a fixed line attached to the aircraft as the jumper exits, eliminating the need for manual activation.
-
D.
rigid airship
A rigid airship is a lighter-than-air aircraft with an internal structural framework that maintains its shape independently of the lifting gas it contains.
-
E.
airspeeder
An airspeeder is a fast, maneuverable, typically small aerial vehicle designed for rapid personal or cargo transport through the air.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85ccf2794819096cda4cbcb02d478 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 4:13 a.m.