Triple

T15551504
Position Surface form Disambiguated ID Type / Status
Subject Horse Mesa Dam E370754 entity
Predicate instanceOf P0 FINISHED
Object concrete thin-arch dam C11088 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: concrete thin-arch dam
Context triple: [Horse Mesa Dam, instanceOf, concrete thin-arch dam]
  • A. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • B. concrete gravity dam
    A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
  • C. arch dam chosen
    An arch dam is a curved concrete dam that transfers the water pressure primarily into the abutments through arch action, allowing a thinner structure than gravity dams.
  • D. embankment dam
    An embankment dam is a large artificial barrier constructed from compacted earth or rock materials to hold back water and create a reservoir.
  • E. masonry gravity dam
    A masonry gravity dam is a massive structure built from stone or brick masonry whose own weight resists the horizontal pressure of the water it retains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc6cf40819091f4a5facee1ebe6 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:08 a.m.