Triple
T1553803
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Saltire |
E33154
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Scottish national symbol |
C1005
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Scottish national symbol Context triple: [Saltire, instanceOf, Scottish national symbol]
-
A.
national emblem
chosen
A national emblem is an officially adopted symbol or design that represents a country's identity, heritage, and sovereignty in visual form.
-
B.
symbol of British Overseas Territories
A symbol of British Overseas Territories is an emblem, flag, or insignia that visually represents the collective identity, heritage, and constitutional relationship of the territories with the United Kingdom.
-
C.
national symbol of India
A national symbol of India is an officially designated emblem, object, or representation that embodies the country's heritage, culture, values, and identity.
-
D.
parliamentary emblem
A parliamentary emblem is a formal symbol or insignia that visually represents a parliament’s authority, identity, and constitutional role within a state.
-
E.
government agency of Scotland
A government agency of Scotland is an official public body established by the Scottish Government to implement policies, deliver public services, and regulate specific sectors within Scotland.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885ee6db8819099502bc5ce8af881 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:27 p.m.