Triple
T15531113
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Butlers Gorge Dam |
E370217
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Upper Derwent hydro scheme |
E351790
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Derwent hydro scheme | Statement: [Butlers Gorge Dam, partOf, Upper Derwent hydro scheme]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Upper Derwent hydro scheme Context triple: [Butlers Gorge Dam, partOf, Upper Derwent hydro scheme]
-
A.
Derwent hydropower scheme
chosen
The Derwent hydropower scheme is a system of hydroelectric power stations and associated infrastructure that harnesses the flow of the River Derwent to generate renewable electricity.
-
B.
Tummel hydroelectric scheme
The Tummel hydroelectric scheme is a major Scottish power project comprising a series of dams, reservoirs, and power stations that harness the waters of the River Tummel and its tributaries to generate electricity.
-
C.
Gordon–Pedder hydroelectric scheme
The Gordon–Pedder hydroelectric scheme is a major Tasmanian power project that harnesses water from Lake Pedder and surrounding catchments to generate hydroelectricity for the region.
-
D.
Tryweryn reservoir scheme
The Tryweryn reservoir scheme was a controversial mid-20th-century project by Liverpool Corporation to flood the Welsh village of Capel Celyn to create a water supply reservoir, becoming a lasting symbol of Welsh nationalist grievance.
-
E.
Rheidol hydroelectric scheme
The Rheidol hydroelectric scheme is a major hydroelectric power installation in Ceredigion, Wales, harnessing the River Rheidol to generate renewable electricity.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cc521a08190921fb50319dddc34 |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e0414773548190b3311515f9d957dd |
completed | April 16, 2026, 1:54 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff45549e4881908ab0769e49ba5dc4 |
completed | May 9, 2026, 2:31 p.m. |
Created at: April 10, 2026, 4:06 a.m.