Triple

T1552719
Position Surface form Disambiguated ID Type / Status
Subject Yalta Sea Port E33129 entity
Predicate instanceOf P0 FINISHED
Object maritime port C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maritime port
Context triple: [Yalta Sea Port, instanceOf, maritime port]
  • A. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • B. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • C. maritime zone
    A maritime zone is a legally defined area of the sea, measured from a coastal state's baseline, within which specific rights, jurisdiction, and responsibilities are allocated under international law.
  • D. Port city
    A port city is an urban center located on a coast, river, or lake that serves as a hub for maritime transport, trade, and related economic and cultural activities.
  • E. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ee6db8819099502bc5ce8af881 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:26 p.m.