Triple

T15524205
Position Surface form Disambiguated ID Type / Status
Subject Ropsha hills gravity system E369041 entity
Predicate instanceOf P0 FINISHED
Object hydraulic engineering system C26460 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1794cc8190b0b428716296e63e completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 4:05 a.m.