Triple

T15506922
Position Surface form Disambiguated ID Type / Status
Subject Taoyuan Airport MRT E379105 entity
Predicate instanceOf P0 FINISHED
Object railway line in Taiwan C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway line in Taiwan
Context triple: [Taoyuan Airport MRT, instanceOf, railway line in Taiwan]
  • A. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • B. railway line in the Philippines
    A railway line in the Philippines is a fixed transportation corridor consisting of tracks, stations, and related infrastructure used for the operation of passenger and/or freight trains within the Philippine archipelago.
  • C. Taiwan Railways Administration station
    A Taiwan Railways Administration station is a designated railway facility in Taiwan where TRA trains stop to allow passengers and freight to board, alight, or be transferred, and which provides related operational and customer services.
  • D. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd53a7c819080f5b9042c4c199e completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 3:55 a.m.