Triple
T15476607
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hsinchu–Taipei–Keelung corridor |
E376795
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-tech industrial region |
C26
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-tech industrial region Context triple: [Hsinchu–Taipei–Keelung corridor, instanceOf, high-tech industrial region]
-
A.
industrial center
An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
-
B.
economic and technological development zone
An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
-
C.
industrial district
An industrial district is a designated urban or regional area characterized by a high concentration of manufacturing, warehousing, and related industrial activities supported by specialized infrastructure and services.
-
D.
technology region
chosen
A technology region is a geographically defined area characterized by a high concentration of technology-related activities, infrastructure, companies, and talent that collectively drive innovation and economic growth.
-
E.
coastal industrial area
A coastal industrial area is a shoreline zone dominated by factories, ports, warehouses, and related infrastructure that support manufacturing, shipping, and other large-scale economic activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd21dcc81908646251b1c26ea00 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 3:34 a.m.