Triple

T15450685
Position Surface form Disambiguated ID Type / Status
Subject San Francisco Central Subway project E370141 entity
Predicate instanceOf P0 FINISHED
Object urban rail transit project C35368 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban rail transit project
Context triple: [San Francisco Central Subway project, instanceOf, urban rail transit project]
  • A. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • B. rapid transit expansion project chosen
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • C. urban rail loop line
    An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
  • D. intercity passenger rail project
    An intercity passenger rail project is a coordinated planning, design, and construction effort to develop or improve rail infrastructure and services that transport people efficiently between cities over medium to long distances.
  • E. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a19180081909925012fbf4e62a3 completed April 10, 2026, 2:02 a.m.
Created at: April 10, 2026, 3:21 a.m.