Triple

T1540756
Position Surface form Disambiguated ID Type / Status
Subject Bow Bridge (Central Park) E32858 entity
Predicate designer P184 FINISHED
Object Jacob Wrey Mould E17087 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jacob Wrey Mould | Statement: [Bow Bridge (Central Park), designer, Jacob Wrey Mould]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jacob Wrey Mould
Context triple: [Bow Bridge (Central Park), designer, Jacob Wrey Mould]
  • A. Jacob Wrey Mould chosen
    Jacob Wrey Mould was a 19th-century British-born architect and designer known for his ornate, polychromatic work on major New York City landmarks, including parts of Central Park and the Metropolitan Museum of Art.
  • B. Benjamin Woodward
    Benjamin Woodward was a 19th-century Irish architect known for his influential Gothic Revival designs and his role in the firm Deane and Woodward.
  • C. George Burroughs
    George Burroughs was a Puritan minister in colonial New England who was infamously executed for alleged witchcraft during the Salem witch trials.
  • D. William Jessop
    William Jessop was a prominent 18th-century English civil engineer known for his influential work on canals, docks, and early railways during the Industrial Revolution.
  • E. Leffert L. Buck
    Leffert L. Buck was an American civil engineer known for his pioneering work in long-span bridge design at the turn of the 20th century.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ed29088190a3c2d5a3d100c16e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa61faaaa4819089120e25f4bcb0f6 completed March 6, 2026, 5:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69adf3b2c2788190a22c3b45dedb1484 completed March 8, 2026, 10:09 p.m.
Created at: March 4, 2026, 7:26 p.m.