Triple

T1540744
Position Surface form Disambiguated ID Type / Status
Subject Bow Bridge (Central Park) E32858 entity
Predicate instanceOf P0 FINISHED
Object cast-iron pedestrian bridge C3860 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cast-iron pedestrian bridge
Context triple: [Bow Bridge (Central Park), instanceOf, cast-iron pedestrian bridge]
  • A. pedestrian bridge chosen
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • B. pedestrian skybridge
    A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
  • C. ornamental bridge
    An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
  • D. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • E. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ed29088190a3c2d5a3d100c16e completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:26 p.m.