Triple

T1540397
Position Surface form Disambiguated ID Type / Status
Subject San Francisco–Oakland Bay Bridge E32851 entity
Predicate originalEasternSpanClosed P30164 FINISHED
Object 2013 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2013 | Statement: [San Francisco–Oakland Bay Bridge, originalEasternSpanClosed, 2013]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: originalEasternSpanClosed
Context triple: [San Francisco–Oakland Bay Bridge, originalEasternSpanClosed, 2013]
  • A. endOfSpanishBranch
    Indicates that something marks the termination or final point of a Spanish-related branch within a larger structure or sequence.
  • B. eraEnd
    Indicates the point in time or event at which a particular era, period, or phase comes to a close.
  • C. easternPartOccupiedBy
    Indicates that the eastern portion of a region, area, or object is taken up, inhabited, or used by a specified entity.
  • D. closedDuring
    Indicates that an entity is not open or available for use during a specified time period or under certain conditions.
  • E. closedBy
    Indicates that one entity performs the action of closing, finishing, or terminating another entity (such as a task, issue, or process).
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ed29088190a3c2d5a3d100c16e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa95c1a2948190a2b98469afec1a7d completed March 6, 2026, 8:52 a.m.
PD Predicate disambiguation batch_69a907b2453c8190a41f6b88c8217d1e completed March 5, 2026, 4:33 a.m.
PDg Predicate description generation batch_69a93df847cc8190b6d011af33b34b40 completed March 5, 2026, 8:25 a.m.
Created at: March 4, 2026, 7:26 p.m.