Triple
T15401814
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shiroro Dam |
E368336
|
entity |
| Predicate | managingAgency |
P86
|
FINISHED |
| Object | Nigerian Electricity Regulatory Commission (regulation) |
E978711
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nigerian Electricity Regulatory Commission (regulation) | Statement: [Shiroro Dam, managingAgency, Nigerian Electricity Regulatory Commission (regulation)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Nigerian Electricity Regulatory Commission (regulation) Context triple: [Shiroro Dam, managingAgency, Nigerian Electricity Regulatory Commission (regulation)]
-
A.
Nigerian Electricity Regulatory Commission
chosen
The Nigerian Electricity Regulatory Commission is the independent regulatory body responsible for overseeing, licensing, and setting tariffs for Nigeria’s electricity supply industry.
-
B.
Electricity Regulatory Authority (Uganda)
The Electricity Regulatory Authority (Uganda) is the national body responsible for licensing, regulating, and overseeing Uganda’s electricity generation, transmission, distribution, and sale to ensure reliable and fairly priced power.
-
C.
Transmission Company of Nigeria
The Transmission Company of Nigeria is the state-owned utility responsible for operating and maintaining Nigeria’s national electricity transmission grid.
-
D.
Nigerian Upstream Petroleum Regulatory Commission
The Nigerian Upstream Petroleum Regulatory Commission is the government agency responsible for regulating and overseeing Nigeria’s upstream oil and gas exploration and production activities.
-
E.
Central Electricity Regulatory Commission
The Central Electricity Regulatory Commission is India’s national-level regulatory body responsible for overseeing and regulating the country’s interstate electricity generation, transmission, and trading to ensure fair tariffs and a reliable power sector.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a16c68c819099c1b547fbc87b32 |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e03e8ea0ac8190a5c68b1951ad3db1 |
completed | April 16, 2026, 1:42 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff13584f8881908b2527c51f85ae28 |
completed | May 9, 2026, 10:58 a.m. |
Created at: April 10, 2026, 3:19 a.m.