Triple
T15346274
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cluny Dam |
E366926
|
entity |
| Predicate | downstreamFrom |
P5956
|
FINISHED |
| Object | Wayatinah Power Station |
E1144314
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wayatinah Power Station | Statement: [Cluny Dam, downstreamFrom, Wayatinah Power Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Wayatinah Power Station Context triple: [Cluny Dam, downstreamFrom, Wayatinah Power Station]
-
A.
Wayatinah Power Station
chosen
Wayatinah Power Station is a hydroelectric power facility in Tasmania, Australia, that generates electricity using water from the Derwent River system.
-
B.
Kiira Power Station
Kiira Power Station is a major hydroelectric power plant on the Nile River in Uganda that significantly contributes to the country’s electricity generation.
-
C.
Markaba power station
Markaba power station is a hydroelectric facility in Lebanon that harnesses the flow of the Litani River to generate electricity.
-
D.
Atiamuri Power Station
Atiamuri Power Station is a hydroelectric power station in New Zealand that generates electricity from the flow of the Waikato River.
-
E.
Uri I Power Station
Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a1355608190a6673ddb67231d54 |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e03e1749bc8190a8b9cbcb27288a5b |
completed | April 16, 2026, 1:40 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff01f931408190828d87567cecaceb |
completed | May 9, 2026, 9:44 a.m. |
Created at: April 10, 2026, 3:17 a.m.