Triple
T15346273
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cluny Dam |
E366926
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Tasmanian water management system
The Tasmanian water management system is an integrated network of dams, reservoirs, and related infrastructure that regulates water supply, hydroelectric power generation, and flood control across Tasmania.
|
E1151757
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tasmanian water management system | Statement: [Cluny Dam, partOf, Tasmanian water management system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tasmanian water management system Context triple: [Cluny Dam, partOf, Tasmanian water management system]
-
A.
Murray–Darling Basin water management system
The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
-
B.
Hydro Tasmania
Hydro Tasmania is Australia's largest producer of renewable energy, primarily generating hydroelectric power from Tasmania's extensive network of dams and power stations.
-
C.
Lachlan Valley Water
Lachlan Valley Water is a regional water management authority responsible for overseeing water resources and catchment health in the Lachlan River valley of New South Wales, Australia.
-
D.
Commonwealth Environmental Water Holder
The Commonwealth Environmental Water Holder is an Australian government body responsible for managing and using the Commonwealth’s water entitlements to protect and restore environmental health in river systems, particularly within the Murray–Darling Basin.
-
E.
Murrumbidgee Irrigation Area
The Murrumbidgee Irrigation Area is a major agricultural region in New South Wales, Australia, renowned for its extensive irrigation schemes that support fruit, rice, and other crop production.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Tasmanian water management system Triple: [Cluny Dam, partOf, Tasmanian water management system]
Generated description
The Tasmanian water management system is an integrated network of dams, reservoirs, and related infrastructure that regulates water supply, hydroelectric power generation, and flood control across Tasmania.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Tasmanian water management system Target entity description: The Tasmanian water management system is an integrated network of dams, reservoirs, and related infrastructure that regulates water supply, hydroelectric power generation, and flood control across Tasmania.
-
A.
Murray–Darling Basin water management system
The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
-
B.
Hydro Tasmania
Hydro Tasmania is Australia's largest producer of renewable energy, primarily generating hydroelectric power from Tasmania's extensive network of dams and power stations.
-
C.
Lachlan Valley Water
Lachlan Valley Water is a regional water management authority responsible for overseeing water resources and catchment health in the Lachlan River valley of New South Wales, Australia.
-
D.
Commonwealth Environmental Water Holder
The Commonwealth Environmental Water Holder is an Australian government body responsible for managing and using the Commonwealth’s water entitlements to protect and restore environmental health in river systems, particularly within the Murray–Darling Basin.
-
E.
Murrumbidgee Irrigation Area
The Murrumbidgee Irrigation Area is a major agricultural region in New South Wales, Australia, renowned for its extensive irrigation schemes that support fruit, rice, and other crop production.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a1355608190a6673ddb67231d54 |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e03e1749bc8190a8b9cbcb27288a5b |
completed | April 16, 2026, 1:40 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff01f931408190828d87567cecaceb |
completed | May 9, 2026, 9:44 a.m. |
| NEDg | Description generation | batch_69ff034de0508190aea8068e9c3d04d3 |
completed | May 9, 2026, 9:50 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ff03c0ebc081908b1a132256e9d004 |
completed | May 9, 2026, 9:52 a.m. |
Created at: April 10, 2026, 3:17 a.m.