Triple

T15318650
Position Surface form Disambiguated ID Type / Status
Subject QAN E366228 entity
Predicate stationCodeFor P1289 FINISHED
Object Quantico train station E74699 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Quantico train station | Statement: [QAN, stationCodeFor, Quantico train station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Quantico train station
Context triple: [QAN, stationCodeFor, Quantico train station]
  • A. Quantico (Amtrak station) chosen
    Quantico (Amtrak station) is a passenger rail station in Quantico, Virginia, served by Amtrak and Virginia Railway Express trains along the busy Northeast Corridor.
  • B. Belmont station
    Belmont station is a commuter rail stop in Downers Grove, Illinois, served by Metra’s BNSF Railway Line connecting the suburb to downtown Chicago.
  • C. Belmont station
    Belmont station is a major Chicago Transit Authority 'L' station on the North Side that serves as a key transfer point between multiple rapid transit lines.
  • D. Winchester Center station
    Winchester Center station is a commuter rail station in Winchester, Massachusetts, serving MBTA's Lowell Line north of Boston.
  • E. Woodbury station
    Woodbury station was the original name of what is now known as Cold Spring Harbor station on the Long Island Rail Road.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a121520819093dcce999fdefe1a completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e03dd356b881908f054b64eee6a371 completed April 16, 2026, 1:39 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff0b3dac6c81908eaa0aaad29113ee completed May 9, 2026, 10:23 a.m.
Created at: April 10, 2026, 3:16 a.m.