Triple
T1529475
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Indira Gandhi Canal |
E32407
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | irrigation canal |
C3383
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: irrigation canal Context triple: [Indira Gandhi Canal, instanceOf, irrigation canal]
-
A.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
B.
drainage channel
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
-
C.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
-
D.
canal
chosen
A canal is a man-made waterway constructed to facilitate transportation, irrigation, drainage, or water management between different locations.
-
E.
swing aqueduct
A swing aqueduct is a movable water bridge that pivots horizontally to allow both canal traffic across a gap and the passage of boats or vehicles beneath by swinging out of the way.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885ea86308190998f6bc14bb91f8e |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:26 p.m.