Triple
T1529425
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alpine-Himalayan orogenic belt |
E32406
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | orogenic belt |
C8917
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: orogenic belt Context triple: [Alpine-Himalayan orogenic belt, instanceOf, orogenic belt]
-
A.
orogeny
Orogeny is the geological process by which mountains are formed, typically through the collision, subduction, or lateral movement of tectonic plates that deform and uplift the Earth's crust.
-
B.
geological terrane
A geological terrane is a distinct block of the Earth's crust with a unique geological history and characteristics that has been tectonically transported and attached to a larger landmass.
-
C.
volcanic arc
A volcanic arc is a curved chain of volcanoes that forms above a subducting tectonic plate, typically parallel to an oceanic trench, where magma generated by subduction rises to the surface.
-
D.
submarine mountain chain
A submarine mountain chain is a long, continuous series of underwater mountains, typically formed by tectonic plate movements and volcanic activity along the ocean floor.
-
E.
craton
A craton is an ancient, stable part of the continental lithosphere that has survived geological processes for billions of years, typically forming the core of continents.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885ea86308190998f6bc14bb91f8e |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:26 p.m.