Triple

T15288991
Position Surface form Disambiguated ID Type / Status
Subject Thule Tracking Station E365478 entity
Predicate instanceOf P0 FINISHED
Object U.S. military installation C1085 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: U.S. military installation
Context triple: [Thule Tracking Station, instanceOf, U.S. military installation]
  • A. United States Army installation
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • B. military installation
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • C. Marine Corps base
    A Marine Corps base is a military installation that provides facilities, training grounds, housing, and logistical support for United States Marine Corps personnel and operations.
  • D. United States Air Force base chosen
    A United States Air Force base is a military installation that supports Air Force operations through facilities for aircraft, personnel, training, logistics, and command and control activities.
  • E. U.S. Navy training range
    A U.S. Navy training range is a designated sea, air, or land area equipped and managed for conducting military exercises, weapons testing, and operational training to prepare naval forces for real-world missions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a103d9081908c1ea6c4c73ac8e3 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:15 a.m.