Triple

T15286489
Position Surface form Disambiguated ID Type / Status
Subject chum E365413 entity
Predicate instanceOf P0 FINISHED
Object tent-like structure C36227 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tent-like structure
Context triple: [chum, instanceOf, tent-like structure]
  • A. A-frame structure
    An A-frame structure is a simple, triangular building or framework formed by two sloping sides that meet at the top in the shape of the letter "A," providing strong, stable support with minimal materials.
  • B. wooden hut
    A wooden hut is a small, simple shelter constructed primarily from timber, typically featuring a basic structure with minimal amenities for temporary or rustic habitation.
  • C. ornamental pavilion
    An ornamental pavilion is a small, decorative, often open-sided structure placed in gardens or public spaces to provide shelter, focal interest, and aesthetic enhancement.
  • D. brick structure
    A brick structure is a constructed form made primarily from individual clay or concrete bricks bonded together, typically with mortar, to create durable walls, buildings, or other architectural elements.
  • E. timber structure
    A timber structure is a construction system in which the primary load-bearing framework is made from engineered or solid wood members connected to safely transfer loads to the foundation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a103d9081908c1ea6c4c73ac8e3 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:15 a.m.