Triple

T1523544
Position Surface form Disambiguated ID Type / Status
Subject Kennedy Space Center Launch Complex 39A E32283 entity
Predicate instanceOf P0 FINISHED
Object spaceport launch pad C5843 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spaceport launch pad
Context triple: [Kennedy Space Center Launch Complex 39A, instanceOf, spaceport launch pad]
  • A. spaceport facility
    A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
  • B. NASA spaceport
    A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
  • C. space launch facility chosen
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • D. spaceflight center
    A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
  • E. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885e9b0ac819093a9806ad0efc82c completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:26 p.m.