Triple
T15186206
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Upper St. Anthony Falls Lock and Dam |
E362881
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former transportation infrastructure |
C3667
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former transportation infrastructure Context triple: [Upper St. Anthony Falls Lock and Dam, instanceOf, former transportation infrastructure]
-
A.
historic transportation system
A historic transportation system is an organized network of vehicles, routes, and infrastructure from a past era that once facilitated the movement of people or goods and is now preserved, studied, or remembered for its cultural, technological, or historical significance.
-
B.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
C.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
D.
former transit line
A former transit line is a previously operational public transportation route, such as a bus, tram, or rail line, that has been permanently discontinued or replaced.
-
E.
historic infrastructure
chosen
Historic infrastructure comprises long-standing physical structures and systems—such as bridges, roads, canals, and railways—that were built in the past and continue to embody cultural, technological, and architectural significance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a09a39c81908759f23268e2d408 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:09 a.m.