Triple

T15158196
Position Surface form Disambiguated ID Type / Status
Subject Lexington Parkway Station E362133 entity
Predicate namedAfter P63 FINISHED
Object Lexington Parkway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lexington Parkway | Statement: [Lexington Parkway Station, namedAfter, Lexington Parkway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lexington Parkway
Context triple: [Lexington Parkway Station, namedAfter, Lexington Parkway]
  • A. Richmond Parkway
    Richmond Parkway is a major arterial road in Richmond, California, that connects Interstate 80 with Interstate 580 and serves several residential and commercial areas along the city’s northern and western edges.
  • B. Richmond Parkway
    Richmond Parkway is a roadway on Staten Island, New York, that was later renamed the Korean War Veterans Parkway in honor of those who served in the Korean War.
  • C. Columbia Pike
    Columbia Pike is a major historic thoroughfare and commuter route in Northern Virginia that connects Arlington County to Fairfax County and serves as a key corridor into Washington, D.C.
  • D. Leesburg Pike
    Leesburg Pike is a primary arterial roadway in Northern Virginia that connects Tysons to other key communities in the Washington, D.C. metropolitan area.
  • E. Arlington Boulevard
    Arlington Boulevard is a major arterial roadway in Northern Virginia that carries U.S. Route 50 through Arlington and Fairfax counties into the Washington, D.C. metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lexington Parkway
Target entity description: Lexington Parkway is a major thoroughfare in Saint Paul, Minnesota, running through several neighborhoods and serving as a key north–south route in the city.
  • A. Richmond Parkway
    Richmond Parkway is a major arterial road in Richmond, California, that connects Interstate 80 with Interstate 580 and serves several residential and commercial areas along the city’s northern and western edges.
  • B. Richmond Parkway
    Richmond Parkway is a roadway on Staten Island, New York, that was later renamed the Korean War Veterans Parkway in honor of those who served in the Korean War.
  • C. Columbia Pike
    Columbia Pike is a major historic thoroughfare and commuter route in Northern Virginia that connects Arlington County to Fairfax County and serves as a key corridor into Washington, D.C.
  • D. Leesburg Pike
    Leesburg Pike is a primary arterial roadway in Northern Virginia that connects Tysons to other key communities in the Washington, D.C. metropolitan area.
  • E. Arlington Boulevard
    Arlington Boulevard is a major arterial roadway in Northern Virginia that carries U.S. Route 50 through Arlington and Fairfax counties into the Washington, D.C. metropolitan area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0759908190b8a051d2e2a1cbe6 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e0060dd71881908ecc4a4f52d438a5 completed April 15, 2026, 9:41 p.m.
Created at: April 10, 2026, 3:08 a.m.