Triple
T1511756
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rock Creek and Potomac Parkway |
E32028
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road in Washington, D.C. |
C8861
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road in Washington, D.C. Context triple: [Rock Creek and Potomac Parkway, instanceOf, road in Washington, D.C.]
-
A.
street
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
B.
avenue
An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
-
C.
campus roadway
A campus roadway is a designated vehicular and pedestrian circulation route within a campus that connects buildings, parking areas, and facilities while supporting safe, efficient movement and access.
-
D.
north–south highway
A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
-
E.
ceremonial road
A ceremonial road is a specially designated route used for formal processions, rituals, or state occasions, often designed to emphasize symbolic, cultural, or political significance.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885e8caf88190a5fbb6159ce87786 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:26 p.m.