Triple
T15111189
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | House VI |
E360914
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | deconstructivist architecture work |
C25162
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: deconstructivist architecture work Context triple: [House VI, instanceOf, deconstructivist architecture work]
-
A.
deconstructivist building
chosen
A deconstructivist building is an architectural structure characterized by fragmented forms, non-linear geometry, and an apparent sense of controlled chaos that challenges traditional notions of harmony and stability.
-
B.
architectural work
An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
-
C.
modernist architecture work
A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
-
D.
architecture work
An architecture work is a tangible or digital artifact that represents the design, planning, or documentation of a built environment, such as drawings, models, specifications, or design narratives.
-
E.
Constructivist architecture
Constructivist architecture is a modernist architectural style that emerged in early Soviet Russia, characterized by an experimental fusion of engineering and avant-garde art, emphasizing geometric forms, industrial materials, and socially oriented design.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0491ec8190830960be8fafb994 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:05 a.m.