Triple

T15071281
Position Surface form Disambiguated ID Type / Status
Subject Züm E379883 entity
Predicate corridor P5520 FINISHED
Object Bovaird Drive corridor E649889 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bovaird Drive corridor | Statement: [Züm, corridor, Bovaird Drive corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bovaird Drive corridor
Context triple: [Züm, corridor, Bovaird Drive corridor]
  • A. Bovaird Drive corridor chosen
    The Bovaird Drive corridor is a major arterial route in Brampton, Ontario, serving as a key east–west spine for rapid transit, commercial activity, and local traffic.
  • B. Braidwood Road corridor
    The Braidwood Road corridor is a transport and access route running through the bushland of Morton National Park in New South Wales, Australia.
  • C. Randall Road corridor
    The Randall Road corridor is a major commercial strip in Algonquin, Illinois, lined with shopping centers, restaurants, and other retail businesses.
  • D. Snelling Avenue corridor
    The Snelling Avenue corridor is a major urban thoroughfare in Saint Paul, Minnesota, serving as a key transit and commercial spine for surrounding neighborhoods.
  • E. Thornton Road corridor
    The Thornton Road corridor is a major commercial and transportation artery in the Lithia Springs area of Georgia, lined with businesses, retail centers, and access to regional highways.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd7683881908d405c1b5d7b4f7f completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69dff7f86df48190b3a2cf441fefb477 completed April 15, 2026, 8:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69feae11d6648190bc9b5d4f520d694b completed May 9, 2026, 3:46 a.m.
Created at: April 10, 2026, 3:02 a.m.