Triple

T15069094
Position Surface form Disambiguated ID Type / Status
Subject Uhuru Peak E379828 entity
Predicate isEndPointOf P43881 FINISHED
Object Umbwe Route E78470 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Umbwe Route | Statement: [Uhuru Peak, isEndPointOf, Umbwe Route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Umbwe Route
Context triple: [Uhuru Peak, isEndPointOf, Umbwe Route]
  • A. Umbwe Route chosen
    Umbwe Route is a steep, short, and less-traveled ascent path on Mount Kilimanjaro known for its direct approach and challenging terrain.
  • B. Kabale–Kisoro road
    The Kabale–Kisoro road is a major highway in southwestern Uganda that connects the town of Kabale to Kisoro near the borders with Rwanda and the Democratic Republic of the Congo, serving as an important route for regional trade and tourism.
  • C. Karuma–Pakwach road
    The Karuma–Pakwach road is a major transport route in northern Uganda that connects the Karuma area to the town of Pakwach, facilitating regional trade and access to Murchison Falls National Park.
  • D. Gulu–Kitgum Road
    Gulu–Kitgum Road is a major transport route in northern Uganda that connects the towns of Gulu and Kitgum, facilitating regional travel and trade.
  • E. Arusha–Namanga road
    The Arusha–Namanga road is a major highway linking northern Tanzania with Kenya, serving as a key route for cross-border trade and travel between the two countries.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd7683881908d405c1b5d7b4f7f completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69dedeebc7e48190a86b4f0afe8844bb completed April 15, 2026, 12:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69feb7dfae748190a0d59df5cbd5787d completed May 9, 2026, 4:28 a.m.
Created at: April 10, 2026, 3:02 a.m.