Triple

T15055607
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 67 E379481 entity
Predicate connectsTo P845 FINISHED
Object Interstate 55 in Missouri E38193 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 55 in Missouri | Statement: [U.S. Route 67, connectsTo, Interstate 55 in Missouri]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 55 in Missouri
Context triple: [U.S. Route 67, connectsTo, Interstate 55 in Missouri]
  • A. Interstate 55 chosen
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • B. Interstate 355
    Interstate 355 is a toll highway in the Chicago metropolitan area that serves as a suburban north–south bypass around the city.
  • C. Interstate 44
    Interstate 44 is a major east–west U.S. highway running from Texas through Oklahoma and Missouri to the St. Louis area, serving as a key transportation corridor in the central United States.
  • D. Missouri Route 65
    Missouri Route 65 is a major north–south state highway in Missouri that runs through central and southwest parts of the state, connecting rural areas with larger cities.
  • E. U.S. Route 65 (Missouri)
    U.S. Route 65 (Missouri) is a major north–south U.S. Highway running through Missouri, connecting cities such as Branson and Springfield and serving as an important regional transportation corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd64d108190853797a95c11cc45 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69deda937f788190899d81bbb2084443 completed April 15, 2026, 12:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69fea5c11fb4819086c4b85a8d29ccf7 completed May 9, 2026, 3:10 a.m.
Created at: April 10, 2026, 3:01 a.m.