Triple

T1504576
Position Surface form Disambiguated ID Type / Status
Subject Interstate 84 E33869 entity
Predicate connectsTo P845 FINISHED
Object Interstate 87 E33344 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 87 | Statement: [Interstate 84, connectsTo, Interstate 87]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 87
Context triple: [Interstate 84, connectsTo, Interstate 87]
  • A. Interstate 87 chosen
    Interstate 87 is a major north–south highway in New York State that connects New York City to the Canadian border, serving key regions such as the Hudson Valley and the Adirondacks.
  • B. Interstate 87
    Interstate 87 is a major U.S. highway that serves as a key north–south transportation route, notably connecting parts of North Carolina and New York.
  • C. Interstate 86
    Interstate 86 is an east–west U.S. Interstate Highway in New York and Pennsylvania that serves as a major corridor through the Southern Tier region.
  • D. Interstate 83
    Interstate 83 is a major north–south U.S. highway connecting the Baltimore, Maryland area with Harrisburg and other communities in south-central Pennsylvania.
  • E. Interstate 865
    Interstate 865 is a short auxiliary Interstate highway in Indiana that serves as a connector between Interstate 65 and Interstate 465 northwest of Indianapolis.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885f352a4819099b24ff15489dede completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a88731a8f081908b8facef7b602c02 completed March 4, 2026, 7:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7bf5fcf588190bcd52c539c3958b0 completed March 28, 2026, 11:45 a.m.
Created at: March 4, 2026, 7:24 p.m.