Triple

T15028271
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route 5 E378272 entity
Predicate abbreviation P43 FINISHED
Object SR 5
SR 5 is a primary state highway in Georgia that runs generally north–south, connecting the Atlanta metropolitan area with several communities in the northwestern part of the state.
E1133933 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 5 | Statement: [Georgia State Route 5, abbreviation, SR 5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 5
Context triple: [Georgia State Route 5, abbreviation, SR 5]
  • A. SR 502
    SR 502 is a state highway in New Mexico that serves as a key route connecting Los Alamos to other major roads in the region.
  • B. SR 52
    SR 52 is a state highway in Alabama that runs east–west across the southeastern part of the state, connecting several small towns and rural communities.
  • C. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • D. SR 515
    SR 515 is a major north–south state highway in northern Georgia that serves as a key corridor through the Appalachian region and part of the Appalachian Development Highway System.
  • E. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 5
Triple: [Georgia State Route 5, abbreviation, SR 5]
Generated description
SR 5 is a primary state highway in Georgia that runs generally north–south, connecting the Atlanta metropolitan area with several communities in the northwestern part of the state.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 5
Target entity description: SR 5 is a primary state highway in Georgia that runs generally north–south, connecting the Atlanta metropolitan area with several communities in the northwestern part of the state.
  • A. SR 502
    SR 502 is a state highway in New Mexico that serves as a key route connecting Los Alamos to other major roads in the region.
  • B. SR 52
    SR 52 is a state highway in Alabama that runs east–west across the southeastern part of the state, connecting several small towns and rural communities.
  • C. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • D. SR 515
    SR 515 is a major north–south state highway in northern Georgia that serves as a key corridor through the Appalachian region and part of the Appalachian Development Highway System.
  • E. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd46b2c819090d054c27787f677 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded7e0e8c88190ac6f5786b4d4040f completed April 15, 2026, 12:12 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe9dd967588190821cf47e9734db21 completed May 9, 2026, 2:37 a.m.
NEDg Description generation batch_69fe9e5dbbe0819084567688758b0245 completed May 9, 2026, 2:39 a.m.
NED2 Entity disambiguation (via description) batch_69fe9eedca1481908ce438991184d62e completed May 9, 2026, 2:41 a.m.
Created at: April 10, 2026, 2:58 a.m.